



Your Custom Text Here
This David Wilson Homes development on part of the former Ennstone cement works in Doseley, Telford has been designed in phases.
The first phase designed by Townscape Solutions (see photos) achieved detailed permission in November 2007 for 58 Dwellings on 2.1 ha with construction now complete. Constraints included a heavy tree belt limiting the developable area, a sewer splitting the site diagonally, adjacent industry and ecological constraints.
A masterplan for 460 units and open space drawn up by Townscape Solutions for the remainder of the site (see masterplan) was approved in outline in July 2013. Reserved matters for phase 2 have also been approved with construction now underway.
This David Wilson Homes development on part of the former Ennstone cement works in Doseley, Telford has been designed in phases.
The first phase designed by Townscape Solutions (see photos) achieved detailed permission in November 2007 for 58 Dwellings on 2.1 ha with construction now complete. Constraints included a heavy tree belt limiting the developable area, a sewer splitting the site diagonally, adjacent industry and ecological constraints.
A masterplan for 460 units and open space drawn up by Townscape Solutions for the remainder of the site (see masterplan) was approved in outline in July 2013. Reserved matters for phase 2 have also been approved with construction now underway.
Aerial 3d view of masterplan
First phase as built
View into first phase as built
Illustrative masterplan